Houston, Texas

Groundwater control for Houston job sites.

We size the system, operate the pumps, and maintain water levels so work can proceed.

Our dewatering and bypass methods.

Groundwater control and bypass pumping for excavations, utilities, and sites that require a dry working area. Share the site conditions and we will recommend a method.

Wellpoints

Shallow groundwater control for trenches, foundations, and utility work. A header system and vacuum pumping to lower the water table around the excavation.

Deep wells

Higher-yield wells when the excavation needs more drawdown than a wellpoint stage can hold. Used on larger commercial and industrial excavations where the soils allow it.

Bypass pumping

Temporary pumping so a sewer, storm, or force main can stay in service while the line is repaired or replaced.

How a job proceeds.

From the first call to a dry, usable site. Timing and crew details will be confirmed for each job.

01

Call or send plans

Site location, depth, soils if you have them, and when the area needs to be dry. A photo of the excavation is a useful starting point.

02

We size the system

Wellpoints, wells, open pumping, or a combination. You get a written scope. Permit needs are flagged when discharge is involved.

03

Equipment on site

Pumps, hose, and the crew to set the system. Complete with all required piping, fittings, and accessories.

04

We keep the site dry

The system stays in place until the work is done — pour, backfill, or pull. Support and adjustments available as needed.

Featured job

Project highlight — details to be added.

A short write-up of a recent Houston job will go here: the type of system, the site conditions, and the completed result. Placeholder until photos and a description are provided.

View more projects

Need the site dry? Call to discuss the job.